Purushotham Mekala
UNIVERSITY OF HOUSTON

PURUSHOTHAM
MEKALA

Mechanical and Tunnel equipment Specialist

5+ years of hands-on TBM operations and heavy equipment engineering across metro tunneling projects in India. EPB, Slurry & Mixed Shield TBM specialist with hyperbaric intervention expertise and $200M+ project exposure.

5 TBMs Commissioned
30+ CHI Interventions
95%+ Equipment Uptime
$200M Project Value
01

About Me

I am a Mechanical Engineer and TBM Specialist with deep field expertise in tunnel boring machine operations, heavy equipment lifecycle management, and underground construction safety.

My career spans roles at Larsen & Toubro, Myhome Constructions, and EGIS India — covering EPB, Slurry & Mixed Shield TBMs from leading OEMs including Herrenknecht, Robbins, and CRCHI.

Currently pursuing a Master's in Industrial Engineering at University of Houston (GPA: 3.708), I am actively seeking TBM/tunnel mechanical engineering roles in the US with OPT authorization from July 2026.

My edge: I have performed 30+ Cutterhead Interventions under hyperbaric conditions — a rare, high-value skill that very few engineers in the US possess.

Certifications & Training
NEBOSH IGC
NEBOSH IDIP
ISO 45001
Lean Six Sigma GB
SAP MM
Heavy Lifting Ops
OSHA Rigging & Safety
Power BI / Excel
EDUCATION
M.S. Industrial Engineering
University of Houston · 2024–2026
GPA: 3.708
B.Tech Mechanical Engineering
SVCET · 2013–2017
GPA: 3.6
02

Experience

SEP 2021 — JUL 2024
Larsen & Toubro
Mechanical Engineer – TBM & Heavy Equipment Operations
  • Led erection, commissioning, and dismantling of 5 EPB, Slurry & Mixed Shield TBMs from Herrenknecht, Robbins, and CRCHI — 7.5 m cutterhead diameter — on metro tunneling projects valued at $200M+, achieving 100% schedule adherence.
  • Managed operation and maintenance of 20+ heavy assets including TBM backup gantries, segment erectors, screw conveyors, mucking systems, and grouting plants, maintaining >95% equipment availability.
  • Performed 30+ Cutterhead Interventions (CHI) under hyperbaric conditions (compressed air up to 2 bar), ensuring zero safety incidents and compliance with international tunneling standards.
  • Designed and implemented 25+ heavy lifting plans for TBM components (cutterhead, shield sections, gantry assemblies up to 100–250 tons) using AutoCAD.
EPB TBM Slurry TBM Herrenknecht Robbins CRCHI Hyperbaric CHI 7.5m Cutterhead
NOV 2019 — AUG 2021
Myhome Constructions
Mechanical Engineer
  • Managed 25+ construction equipment assets including tower cranes (10–25T), batching plants (30–60 m³/hr), transit mixers, and concrete pumps (90–120 m³/hr) for G+20 to G+40 high-rise projects.
  • Led installation and commissioning of tower cranes (20–30 m jib) using crawler/mobile cranes up to 100-ton capacity, zero major incidents.
  • Developed heavy lifting plans for structural materials and equipment handling up to 25-ton operational loads.
Tower Cranes Batching Plants Heavy Lifting High-Rise Construction
JAN 2018 — AUG 2019
EGIS India
Environment, Health & Safety Engineer
  • Implemented EHS systems across large-scale infrastructure projects covering 300–500+ workforce, achieving >98% safety compliance during audits.
  • Conducted 50+ HIRA and JSA assessments for high-risk activities including 100-ton crane ops, work at height >30m, and confined space entry.
  • Led RCA investigations reducing repeat incidents by 15–20% through CAPA implementation.
HIRA JSA ISO 45001 RCA / CAPA PTW
03

Key Operations

TBM Assembly – Robbins TBM at CMRL Chennai Metro, L&T
ROBBINS TBM · CMRL CHENNAI METRO · L&T
01
TBM Commissioning & Assembly

Full erection, commissioning, and dismantling of 5 EPB, Slurry & Mixed Shield TBMs for metro rail tunneling. Coordinated with OEM teams from Herrenknecht, Robbins, and CRCHI.

5 TBMs · 7.5M Diameter · $200M+ Projects
Crew briefing before hyperbaric CHI intervention inside TBM tunnel
CHI CREW BRIEFING · ROYAPETTAH STATION · L&T
02
Hyperbaric CHI Interventions

Performed 30+ Cutterhead Interventions under compressed air up to 2 bar. Cutter inspection, replacement, and face support operations with zero safety incidents.

30+ Interventions · Up to 2 Bar · Zero Incidents
1200T tandem crane lift of TBM cutterhead TBM lowering into Royapettah launch shaft
1200T TANDEM LIFT · ROYAPETTAH STATION · CMRL
03
Heavy Lifting Engineering

Designed 25+ heavy lifting plans using AutoCAD for TBM components including cutterheads, shield sections, and gantry assemblies up to 250 tons.

25+ Lift Plans · Up to 250T · AutoCAD Design
📊 04
Fleet Reliability Program

Built and managed preventive/predictive maintenance programs for 20+ assets. Achieved >95% uptime with 15–20% breakdown reduction across metro project fleet.

20+ Assets · >95% Uptime · 15–20% Fewer Breakdowns
🛡️ 05
EHS Management Systems

Deployed ISO 45001-aligned EHS systems for 300–500 workforce. Conducted 50+ HIRA/JSA assessments. Achieved >98% compliance in all audits.

500 Workforce · 98% Compliance · 50+ Assessments
📦 06
Spare Parts & Inventory Control

Managed 500+ critical spare parts inventory using SAP MM. Reduced downtime from material shortages by 15% while maintaining cost efficiency targets.

500+ Parts · SAP MM · 15% Downtime Reduction
04

Technical Skills

TBM & Tunneling
EPB, Slurry & Mixed Shield TBM Ops95%
Cutterhead Intervention (CHI)90%
TBM Assembly & Commissioning92%
Segment Erector & Mucking Systems88%
Maintenance & Reliability
Preventive & Predictive Maintenance93%
Root Cause Analysis (RCA)90%
Hydraulic & Mechanical Systems88%
KPI Monitoring (MTBF / MTTR)85%
Engineering & Software
AutoCAD (Lifting Plans)85%
SAP Materials Management80%
Power BI & Excel Analytics82%
Safety & Compliance
OSHA / ISO 45001 Compliance92%
HIRA & JSA Risk Assessment90%
Lean Six Sigma78%
05

TBM Systems Knowledge

CUTTERHEAD FRONT SHIELD MID SHIELD TAIL SHIELD BACKUP GANTRIES RINGS ROTATION THRUST →
EPB / SLURRY TBM — CROSS SECTION SCHEMATIC
01

Cutterhead & Disc Cutters

Inspection, cutter change, and bearing replacement. 30+ hyperbaric CHI interventions under 2 bar compressed air.

02

Main Drive & Hydraulics

Cutterhead drive motor diagnostics, hydraulic circuit troubleshooting, thrust cylinder maintenance and calibration.

03

Screw Conveyor & Mucking

Muck extraction system operations, screw conveyor maintenance, belt conveyor alignment and tension management.

04

Segment Erector & Grouting

Precast segment handling and ring build coordination. Tail void grouting plant operations and pressure management.

06

Contact

Available for Opportunities
Currently completing M.S. Industrial Engineering at University of Houston. Available for full-time roles from July 2026 via OPT work authorization.

Open to positions across the US in tunnel/TBM engineering, with particular interest in metro rail, water infrastructure, and highway tunneling projects.
TBM Mechanical Engineer Tunnel Engineer Equipment Engineer M&R Engineer